Reduced Costs, Better Control, More Up-Time for JCB

JCB, one of the world’s top manufacturers of industrial and construction equipment, found that it did not have enough control over mission-critical parts, supplies and repair kits in its inventory. With unrestricted access to the heavy production/maintenance area, costs were spiraling out of control and critical parts, tools and supplies were routinely out of stock and unavailable when needed.