Longwall build optimises production, reliability and safety

Hastings Deering recently assembled and configured a section of an underground longwall to enable operational testing of the integrated system. With over 100 longwall modifications and upgrades, and over 1200 individual tests in a safe environment, Hastings Deering was able to significantly improve production and ongoing reliability. See how they have taken compatibility testing to the next level.

To keep up to date with Australian Mining, subscribe to our free email newsletters delivered straight to your inbox. Click here.