Generating hydrogen through electrolysis requires a substantial amount of purified water. Without it, there is a risk of equipment failure and poor performance.
A 100-megawatt plant typically requires about 20 square metres per hour (m³/h) of deionised water and about 60m³/h of cooling tower make-up water (if cooling towers are used).
Every production site must therefore have a reliable water source and the means to purify it.